Traffic areas
at Michael Saft Spezialbau GmbH
Repair of Runway Damages
We do not need longer off-periods with our fast-hardening repair system. We can repair outbreaks, joint edges and corner stops/demolition with our PC-mortar BETOPOX 012 Rapid (R2/R4) within a short period. A traffic clearance can be affected within 30 min depending on the robustness system and the component temperature.
The system is controlled by TP RH-BEB StB 02.
The reparation leak can be already used after 20 min and has a more essential stability, such as cold or reaction asphalt.